Notifying DNOs of small-scale renewable installations

Network operators need to be aware of the number and location of energy assets. Notifying DNOs means they can keep installation numbers and properly measure and operate the electricity network.

If you are planning to install any of the below MCS technologies, you are required to notify the relevant network operator:

  • Heat pumps
  • Solar PV
  • Wind
  • Battery storage

How do I determine which DNO needs to be notified for a particular installation?

You can determine a customer’s DNO and how to contact them by using the Energy Network Association’s (ENA) DNO search tool on their website. All you need to do is enter the postcode of where the installation is located.

A customer’s DNO can also be determined by checking the Meter Point Administration Number (MPAN ) which can be found on a copy of the electricity bill for that supply. The first two digits (distributor ID) of a property’s MPAN number correspond to a network operator. The document linked below provides a list of the DNOs according to distributor ID.

VIEW DNO LIST

Frequently asked questions on notifying DNO’s

Each time you install a heat pump on a premises, the relevant DNO must be informed. However, there are two different connection scenarios.

Apply to connect

This applies to premises with new Maximum Demand (MD) between 60A and 100A inclusive. In this scenario, you must apply for a connection prior to installation by completing the heat pump connection form. The DNO will subsequently assess the supply capacity within 10 working days.

Connect & notify

This scenario applies to properties with new Maximum Demand (MD) ≤60A and meeting all other relevant requirements. In this scenario, you can connect the device(s) and should notify the DNO by completing the heat pump connection form within 28 days of the installation.

You will need to examine the installation and visit the property of the required connection to determine which connection scenario will apply. A helpful flow chart produced by the ENA covers the EV charge point and heat pump connection process can be found here.

The same form for both connection scenarios is used and can be found in the ENA resource library: Single Electric Vehicle Charge Points & Heat Pump Installation Application Form

In scenarios where a heat pump is being installed in a premises with an existing DNO connection electricity supply, you can submit the multi-installation application form for heat pumps and EV charging equipment. The form can be accessed via this link: Electric Vehicle Charge Points & Heat Pump Multi-install application form.

If the installation meets all the notification criteria (detailed in the form), you will need to notify the relevant DNO within 28 days of installing the new equipment. If the installation does not meet all the notification criteria, you must submit an application to the relevant DNO using the form, before connecting new equipment.

You must notify the relevant DNO of your electricity-generating installations in all instances, including Solar PV technologies. Depending on the capacity of the installation, the DNO can either be notified of the installation after it is commissioned, or there are scenarios where prior permission must be granted before installing.

If Engineering Recommendation G98 applies to the installation and the size of the Solar PV installation is under 16 amps per phase, the DNO will need to be notified within 28 days of the system being commissioned. You will need to complete the following installation document: G98 Form B Single installation of microgenerator, this can be found in the resources below.

If Engineering Recommendation G99 applies to the installation, and the size of the Solar PV installation is greater than 16 amps per phase, then prior permission to connect will need to be granted. As the scope of MCS certification for electricity generation is a maximum of 50kW, Type A G99 is required to be completed for higher capacity MCS installations. You are required to complete the following form in this instance: G99 Form A3-1 Installation of type A power generating modules, please find this in the resources below.

More information on notifying DNOs is available in the Distributed Generators Connection Guide.

DNOs class energy storage (including batteries) as demand when it is importing from the distribution network and generation when exporting to the distribution network. Engineering Recommendation (EREC) G98 and G99 are the technical requirements for the connection of energy storage devices to the network (like that of Solar PV).

If EREC G98 applies to the installation, you can submit G98 Form B to the relevant DNO within 28 days of installation. You can access the form: Form B:  Single installation of microgenerator in the resources section below. The DNO will assess the notification and contact you if the submission is incorrect.

When EREC G99 applies, and for installations over 3.68kW with energy storage (including storage added to AC/DC side of the connections), you are required to fill out the following form: Form A1-1, application for connection of Power Generating Module(s) with Total Aggregate Capacity <50 kW 3-phase or 17 kW single phase. This form must be submitted to the relevant DNO before installation.

The combined A3-1/A3-2 form (installation document for type a power generating modules and integrated microgeneration and storage) confirms what you have installed to G99 Standards, following the installer’s written application. This document must be completed for every Type A power generating facility (e.g., energy storage system).

If you are installing battery storage in conjunction with another technology (e.g., Solar PV), the total connected generation is likely to be above 16 amps per phase so EREC G99 will apply. There is a fast-track application process for these instances, where the capacity is over 3.68kW, the inverter is type-tested to G98 standards and for storage that will not operate when the grid fails. The form you will need to submit is the Form A1-2 application for connection of fully type-tested integrated microgeneration and storage installations. This form must be submitted before installation; however, the connection time is reduced.

Engineering Recommendation (EREC) G98 is called the requirements for the connection of fully type tested micro-generators (up to and including 16A per phase), in parallel with public Low Voltage Distribution Networks. G98 sets out the requirements that must be met before a microgenerator can be connected to the network.

The forms used for notification can be found in the resource library on the ENA website here. They are also available for download below. Please note that the information collected in the ENA forms is standard. However, a particular DNO may require you to use a different form that captures additional information. We would recommend checking with the relevant DNO to determine which form they would prefer you to use before submitting the connection application/notification.

G99_A1.1 application for connection of PGM

32039

Application for connection of PGM

Clipboard icon.

G99 A1.2 G99

31034

G99 fast track

Clipboard icon.

G99 A3.1 and A3.2

33341

Type a PGM and integrated microgen

Clipboard icon.

G98_Form B

48548

Single installations of microgen

Clipboard icon.

G98_Form A multiple installation of microgen

46038

Multiple installation of microgen

Clipboard icon.

EVCP & HP Connections

395365

Multiple installation of microgen

Clipboard icon.

Installer News

Update on investigations into solar mounting certification and flat roof solar PV mounting issues

1st September 2025

Read Full Article
solar panels.

MCS consultation outcome – Proposed changes to MCS requirements for financial protection

19th August 2025

Read Full Article
Family at breakfast table with dog.

MCS launches six-week consultation on updates to MIS 3005-D: Heat Pump Design Standard and MCS 007: Heat Pump Product Standard

4th August 2025

Read Full Article
Installer fitting water tank.

MCS responds to the government’s Solar Roadmap announcement

7th July 2025

Read Full Article
Row of houses with solar PV installed.

Free Heat Pump Association membership for MCS certified heat pump installers

11th June 2025

Read Full Article
Installer crouched down next to heat pump.

Join our FAQ session on the Redeveloped Installer Scheme with Installer

7th May 2025

Read Full Article
Homeowner and installer talking at doorway.